Walking beam furnaces

Walking beam furnaces

In 1982, for the first time BENDOTTI applied the concept of prefabrication to walking beam furnaces. Since then, the beams and the relevant columns have been completely prefabricated at our departments. After that, they are pre-assembled onto the translation frame and onto the hearth of the furnace, before being disassembled and packaged for the final erection.

Thanks to BENDOTTI, a 120 t/h walking beam furnace can be erected in just 93 days.